The strictest standard we build to

Three projects in the studio are being run against a standard that asks a great deal more of a building than any code does: to make more energy over a year than it uses, to collect and treat its own water on the site it stands on, and to avoid a long list of ordinary materials outright rather than by exception.

Most of the work is unglamorous. It is substitution, testing, and saying no to products that would otherwise be specified without a second thought, and then writing down why. We publish the progress here, including the parts that slip.

Buildings in progress

2026

Riverbank CollegeScience and Arts Block

Target: net positive energy and water

2023MarchBrief agreed with the board and the standard adopted
2023SeptemberSite testing: groundwater, sun path, wind
2024FebruaryConsent lodged with a full materials schedule
2024NovemberFrame up; roof water tanks and array installed
2025JuneFit-out with every product checked against the red list
2026MarchTwelve months of monitoring begins on handover

View project

2027

Marsh Road PavilionClubrooms and Changing

Target: net positive water, all timber structure

2024JulyCommunity brief written across four public meetings
2025JanuaryConcept agreed: one room, one roof, one material
2025AugustConsent lodged; rainwater strategy confirmed
2026AprilConstruction begins with a local builder
2027FebruaryHandover and the first winter of readings

View project

2028

Quarry GardensVisitor Building

Target: net positive energy, no fossil fuel on site

2025MayFeasibility and a hard look at whether to build at all
2026MarchDesign begins on a much smaller footprint
2027JanuaryConsent and early works
2028MayOpening, with monitoring published each quarter

View project